Sections of the site
Editor's Choice:
- How to unlock the washing machine ariston
- Pros and cons of LED lighting
- Impulse relay: device and connection
- How to calculate the illumination of a room with LED lamps?
- Plastic box - do-it-yourself aesthetic wiring
- Electricity consumption of underfloor heating: electric and film
- Installing a pump in a well: how to properly install pumping equipment
- Electrician Tool Kit Overview
- How to choose a water heater: the most complete list of evaluation criteria
- 1 acoustics on the example of Sven SPS-860 and Realtek ALC889 codec
Advertising
Technical conditions for connecting to electrical networks for a private house - example |
A building cannot be considered residential if its en / supply is not organized. The difficulty is not in the very connection to power grids, but in the fact that the owners of a private house are often lost, not knowing where to turn. Let's figure out what it is - technical conditions for connecting to electrical networks in relation to a private house, whose competence it is and how much it costs. GOST should not be confused with TU. A standard is a set of government requirements related to a specific field of activity, type of product, and so on. Specifications are departmental documentation developed on the basis of the same GOST, SNiP, internal regulations. That is, these are just the rules that are binding on both parties that appear in the contract for the supply of electricity / energy, as well as the main criteria that must be met by the equipment and the devices used. Definitely - contact the local administration. Making inquiries of neighbors is usually a waste of time. First, they could just buy a house, and they themselves could buy it. But this is not the main thing, since there is a second thing. If in a particular locality (microdistrict) electricity / energy is supplied to the population by various organizations (and this is not uncommon), then they have their own "zones of responsibility". Where is the border? Which of the power engineers is a "networker" and who is a "supplier"? Neighbors may simply not know about this (and they do not have to). But in the corresponding structural unit of the local administration, such data is likely to be available. The second option is to contact the power engineers directly (if the private house is within the boundaries of the settlement). If this is not their territory, they will tell you how to contact subcontractors. There is one more (third) solution. Find out where neighbors settle their electricity bills and contact the payment acceptance point. They will probably tell you how to proceed. Example of technical conditionsEach resource supplying organization can establish its own form of forms for connecting to power grids. They may differ in the alternation of items, their number and a number of other signs. But in any case, the following points should be indicated in the technical specifications.
What to prepareAn application from the owner of a private house for connection to electrical networks will not be accepted if a package of documents is not attached to it. To save time, you need to take the following with you (for the first three - originals and photocopies).
If the application is submitted not by the owner himself, but by another person at his request (order), then an additional power of attorney is attached to carry out such actions. What to considerThe total power of all consumers of electrical energy in the house should not exceed 15 kW. This is stipulated in Regulation No. 861 of 2007 (approved by the Government of the Russian Federation). But it can be increased to 20, if the distance from the point of attachment to the border of the site does not exceed (in m): 500 - rural area, 300 - within the boundaries of the settlement. The standard contract states that its validity period is from 2 to 5 years (no less and no more). But each administrative division may have its own rules that do not directly contradict the governing documents. This issue should be clarified immediately. Regardless of whether the available capacities allow or not, the resource supplying organization is obliged to conclude an agreement for the supply of electricity / energy with the owner of a private residential building. If she does not have such an opportunity at the moment, then the power engineers will have to solve the problem. It is better to order project documentation for connecting to power grids from the provider of this service. This is a guarantee that later there will be no conflict situations. If a third-party organization will develop the project according to the technical conditions, then the power engineers will find something to complain about, it is checked. At least for the fact that they have taken away "a piece of bread." And they will definitely have no complaints about their own departmental designers. Power engineers are required to issue technical specifications within a month. Regardless of the time of year, climatic factors, lack of specialists, they must install everything that is necessary to organize the en / supply of a private house, no more than six months in advance. In some cases (for example, a long distance from the point of connection to the site), the period is increased, but not more than up to two years. If the power engineers do not fit into the agreed time frame, they can not only be “adjusted” with the submitted claim, but also receive monetary compensation. It is enough just to contact a specialized lawyer, and he himself will find the justification, and at the same time determine the approximate amount to be collected. Cost of workThe maximum price for connecting to power grids, which can be indicated by suppliers of electricity / energy (if the capacity does not exceed 15 kW) - 550 rubles. An additional payment can be made only if the owner wishes to speed up this process. But only with his personal consent, without any coercion. Often, power engineers, taking advantage of our incompetence, go to various tricks in order to increase the payment for connecting to power grids. The arguments are different - the complexity of the work, the lack of capacity, and so on. It is illegal! To put it simply - their problems, not the consumer, which they are trying to solve at his expense. The article highlights the main points that every owner of a private house needs to know about. More detailed information can be obtained only from the resource supplying organization itself, which will issue technical conditions for connecting to electrical networks. As already noted, each has its own rules. Therefore, in order to resolve the issue with the TU the first time, it is advisable to clarify all the nuances in advance in the local division of Energosbyt. |
New
- The role of rhetoric in modern society
- Force method - calculation of statically indeterminate frames Calculate a plane statically indeterminate bar system
- Rhetoric is practiced speech, memory and breathing.
- Objective side of corpus delicti
- Invasive research methods
- MEA spoke about the future of world energy Energy future of the country
- The world of modern materials - laser principles
- Comparative analysis of the classical method of conducting field seismic operations and the Slip-Sweep method Two-dimensional seismic exploration method ogt
- Timeline of communication history
- Dimensional analysis and analogy method