Obtaining technical specifications for power supply

SpetsMontazhProekt LLC

  • Services for obtaining technical conditions in Moscow and the Moscow region
  • Saving time and money
  • Professional advice
  • All permits
  • Always good prices and discounts

TU is a document that establishes the technical requirements that a product, material or substance must comply with. Additionally, the document specifies a procedure that involves checking compliance with the requirements. Specifications for electricity supply is a paper where all the requirements are met, the fulfillment of which is important for connecting to the electrical energy network and for increasing power consumption.

Each indicator is individual and depends on the required power, so the specifications contain different components. For example, specifications for supplying electricity to a private house contain only calculations of existing networks, and specifications for supplying energy to a store have specified requests for the design of transformer substations, replacement of cable or overhead lines, if necessary.

Why is it necessary to accept technical specifications for power supply

Many companies and organizations need to obtain technical specifications for electricity supply. This document will establish the needs of the technical plan for a variety of objects. It is necessary to obtain technical specifications to increase the installed capacity or connect to electricity networks.

All requirements are varied and depend on the power consumption and purpose of objects:

  • TU for the power supply of private houses;
  • Specifications for the supply of electricity to various premises (warehouses, supermarkets and warehouses);
  • technical conditions for the restoration of engineering networks, the elimination or repair of various types of electrical networks.

Depending on the direction for obtaining technical specifications, the characteristics and indicators, the composition of the document change.

Structure and acceptance of specifications for power supply

Electricity in the Moscow region and other regions is an indispensable component of any object and site. In accordance with the current rules in the Russian Federation, technical specifications are an important part when drawing up a connection agreement, that is, specifications are not an independent document, provision of conditions without an agreement is not provided.

In order to obtain technical conditions for power supply correctly, it is important to go through the following steps:

  1. Bringing an application for drawing up an act and obtaining technical specifications to a network organization.
  2. The signature of the contract, which involves the legal and technical aspects of the connection.
  3. Compliance with the indicators and other points specified in the contract, which are important in order to be able to connect the electrical supply.
  4. Obtaining a permit document to receive electrical supply to the Applicant's facilities, which is issued by the authorities of the State Energy Supervision Authority.
  5. Writing an application of the established form, certifying the execution of the connection in accordance with the requirements of the technical direction.

It is important to submit an application to a network company whose electrical supply facilities are close to the applicant's site.

Required data to obtain technical specifications for electricity

After drawing up the contract, the network company is obliged to notify the private organization within 2 days, through which the applicant hopes to gain access to electricity, drawing up an additional project for connection. Within the same time frame, the organization delivers to the electricity supplier a copy of the contract with the TU, as well as copies of the documents that were submitted by the applicant.

In order for electricity to be supplied, Moscow and the region require some documents:

  1. Layout diagram of electrical installations for which it is necessary to obtain permission to connect to the electrical supply.
  2. One-line diagram of the applicant's networks. The requirement applies only to networks of 35 kV and above.
  3. List of installations with power setting. Refers to components that are connected to an emergency type automation circuit.
  4. A copy of the act of ownership of the object that will be connected.
  5. Legal entities need to additionally obtain an extract from the Unified State Register of Legal Entities.

Moscow and other regions require the provision of all documents. Production and connection starts after receiving the acts. The Moscow region does not change decisions regarding the provision of all documents.

For individuals, the submission procedure and documents are slightly different. This applies to obtaining technical conditions for the connection of electrical installations up to 15 kW. It is also important that the service is provided for needs not related to the operation of the business.


In this case, you need to provide the characteristics:

  1. Full name and details of the passport or any other identity document.
  2. A document that confirms the place of residence of the applicant.
  3. The maximum indicator of the requested power of electrical installations, which they can receive at the applicant's site.

The technological contract contains a list of activities that contribute to the fact that the energy is connected to the applicant.

An example of an agreement for obtaining technical specifications for electricity supply

How to get technical specifications for electricity supply?

You can apply for a technical specification for supply yourself, but it takes a lot of time. Assistance in obtaining technical specifications in Moscow and the Moscow region is best entrusted to qualified persons. The electric power industry will be connected in accordance with all requirements, calculations are carried out at a professional level.

Customer Reviews

Work examples

Chain of restaurants "Burger King"

Implementation of comprehensive work to increase the allocated electrical power to the facility with the reconstruction of the electrical network.

 


Read:



Tonsillitis in adults - what is it, symptoms and treatment, causes, photos and first signs What is throat tonsillitis

Tonsillitis in adults - what is it, symptoms and treatment, causes, photos and first signs What is throat tonsillitis

Tonsillitis got its name from the Latin word tonsillae, which translates as "tonsil". Thus, tonsillitis is caused by an infection, ...

Signs of gastric and duodenal ulcers

Signs of gastric and duodenal ulcers

Friends, hello everyone! We continue the topic of diseases of the digestive system. I will talk about one of the most fraught with complications of diseases - peptic ulcer ...

Prostate cancer of the fourth stage: the possibilities of modern medicine

Prostate cancer of the fourth stage: the possibilities of modern medicine

Prostate cancer of the 4th degree is increasingly becoming the cause of death in men older than 70-75 years. Disappointing medical...

How to talk to a girl and not seem boring What is the best way to communicate with girls

How to talk to a girl and not seem boring What is the best way to communicate with girls

Reading 10 min. Views 162 How to learn to talk to girls. The topic is very big, you need to not just talk to the girl, you need to ...

feed image RSS