Sections of the site
Editor's Choice:
- How to unlock ariston washing machine
- Pros and cons of LED lighting
- Pulse relay: device and connection
- How to calculate the illumination of a room with LED lamps?
- Plastic box - do-it-yourself aesthetic view of electrical wiring
- Electricity consumption of a warm floor: electric and film
- Installing a pump in a well: how to properly install pumping equipment
- Electrician Toolkit Overview
- How to choose a water heater: the most complete list of evaluation criteria
- 1 acoustics on the example of Sven SPS-860 and Realtek ALC889 codec
Advertising
Introductory switchgear (ASU) |
Hello, dear readers of the Electrician's Notes website. In past articles, I told you in detail about how to do it correctly. Today's article will be devoted to the topic of the introductory switchgear, or in short - ASU. This phrase has been repeatedly mentioned in my previous articles.
And I also want to add that in this article we will talk about introductory switchgear (ASU) of residential premises and buildings (administrative, domestic and public). What is an input switchgear?An introductory switchgear is a set of protection devices (, fuses, etc.), (ammeters, voltmeters,), (knife switches, disconnectors, current transformers, busbars, etc.) and building structures that are installed at the input to a residential a room or a building, including, among other things, protection devices and electricity meters for outgoing lines.
Here is an example of ASU-0.4 (kV) of a residential apartment building, which we installed at. In our own words, we can say that the ASU is an introductory switchgear that supplies electricity to the entire building. It can be a residential apartment building, a detached office building, or an ordinary private house or cottage. As you can see, in the photo above it is fully observed, which I advise you not to neglect when performing installation work. Place of installation of the input switchgearThe installation location of the input switchgear (ASU) is determined by the project. It is also possible that several ASUs can be located in the building at once. According to the PUE, clause 7.1.30, the ASU should be installed in specially designed rooms with an ambient temperature of at least +5 o C.
Only trained service personnel have the right to enter the premises of the ASU, i.e. (PUE, clause 7.1.28).
The cabinet of the inlet switchgear must be installed in an accessible and easily maintained place, where there is electric lighting and natural air ventilation. The cabinet must have a degree of protection IP31 and higher, and be located at a distance of at least 1 (m) from the following communications: hot water supply cold water supply heating sewerage gas pipeline The doors of the premises where the ASU is installed should only open outwards (PUE, clause 7.1.29). Requirements for the VRUIf the input switchgear (ASU) is powered from an overhead power line (VL), then it must be installed in it. From the definition of the concept of ASU (PUE, clause 7.1.24), it follows that protection devices (automatic devices, fuses, RCDs, difavtomatov) must be installed on all incoming and outgoing lines. Previously, residential apartment buildings were equipped with introductory switchgears of large sizes and dimensions. Their condition at the moment leaves much to be desired, as well as the entire housing stock of Khrushchev and Stalinist buildings.
The simplest and most common inlet cabinet, consisting of a three-pole inlet switch, and ceramic fuses with quartz sand on outgoing lines. And this introductory cabinet is in disrepair. And as soon as he finalized to the cherished day of his replacement? Outgoing lines are protected by old glass fuses with sand. In this VRU-0.4 (kV), the power lines are protected by similar glass fuses, and the lighting circuits are protected by ceramic cork fuses (plugs) of the PRS type. Here are photos after the completion of an overhaul of the electrical wiring of one of the residential buildings, which included the following:
119 comments on the entry “Introductory switchgear (ASU)”I have met such cabinets in my lifetime, now I can imagine what it is. Useful information for a professional and a beginner in your business. Now I know what an input switchgear is, where and how to install it. The information is useful and necessary. Thank you, Dmitry! Somehow it is not normal when the power cables block the terminal block of the meter Dmitry, with your help we are already becoming cool, no, not electricians, but we can definitely be assistants. Thank you! Thank you for your attention and support!!! The fourth photo from the bottom, on the left side - what is the exact name of this old block with a knife switch and is it really possible to find it now? Now this one is not for sale. Only analogues. Unfortunately, everything is so clear. But what is behind the steel casing? The device of the cutter itself? And there are also two knife switches located side by side, connected crosswise. And what are the analogues? I want it to be true to size... I work as an electrician in Portugal. No offense, Portugal is not Germany, but these are very far away in terms of the quality of materials, the execution leaves much to be desired (the wires intersect, laid somehow, here for such work on hand). Why not unify the standards? A.B.C=L1,L2,L3:U,V,W.brown,black,grey? With uv. If there is voltage in the lie, I can remove and install protection devices for outgoing lines if I need to connect to one of them Marat, do you mean group (line) fuses? If yes, then remove the fuse and connect. Then put the fuse back in and you're done. And if there is no basement, then where can you install an ASP? Natalya, the article also says that ASUs should be installed in specially designed rooms with an ambient temperature of at least +5 oС. This room is defined by the project. Please tell us more about reversible knife switches. I join the request of Victor. But I just don’t see the insulators on the outgoing phase buses? Valentin, in which photo do you not see the insulators? Are the tires in ASU made of aluminum? When connecting to group fuses, do I need to use ferrules? Bus N and bus PE seem to be connected in two places? And I heard: an automatic device is installed to the arresters, so if the arrester is triggered, the automatic device turns off consumer groups. What kind of automatic characteristic is this? The input of group lines is made in a corrugation not in a pipe, but what about protection against rats and mice? How is the lighting in the ASU 220 cabinet taken from the input cable? For the sake of interest: is there a magnetic starter on the old ASU? For what? Thank you very much, very informative. In my house (5th floor) under my apartment there is an ASU, which is very buzzing, there was no such hum before. Please answer what it is connected with and what anti-noise measures can be taken. Elena, contact the management company about this. ASU should not make a hum. The hum is emitted by electromagnetic devices such as transformers, chokes, etc. Perhaps the electricians installed something additionally in the ASU room, which began to make a hum. Tell Dmitry, the figure shows an ASU with a meter connected through current transformers, so the PE and N buses are connected together, and if the meter is directly connected, then the PE and N buses are not connected, i.e. The PEN conductor comes to the GZSH, and the N conductor is taken from the GZSH and goes to the meter, and already from the meter to the N bus. When the building is powered by the TN-C system and its further transition to the TN-C-S system, the PE and N buses are connected to each other in the ASU. The PE bus is re-grounded. Read an article about and. Read about the meter connection schemes in the "Electricity Metering" section. In the article Electric meter connection diagram - PE bus and N bus are not connected. I understand that the diagram does not show an introductory counter (in the ASU). I wanted to see how the direct connection counter is connected to the ASU. I would like to continue this topic in the future. ASU for 2 inputs, ATS, etc. Yes, Dmitry, it is planned. I am very familiar with ATS, especially ATS in electrical installations 10 (kV). The article about AVR is very interesting Good afternoon!! Please answer the question: Can I refuse to install an introductory machine that is installed in front of the electric meter?? Hello! Tell me why it happened: I changed the switchboard in Khrushchev (4 entrances) - put a 3-phase switch, automatic switches instead of inserts, new aluminum tires. All the wiring is old aluminum, the wires are connected to zero - through bolts with an M6 nut with enlarged washers, on a knife switch with shear bolts. I handed everything out from the heart. Sergey, you need to see how the installation is done. A voltage surge can occur during switching overvoltages during the closing of circuit breakers, but these are milliseconds and the lamps should not burn out. Tell me what happened next. Have the ASU already been put into operation? The shield was put into operation and no longer turned off (people began to grumble about the shutdown for 2 days). The damage was quickly revealed - it turned out to be not big - several thousand rubles (compared to the amount of work according to the estimate) and it was reimbursed. But As an electrician, this moment is unpleasant for me. I have doubts about the connections of old aluminum wires in interfloor shields, solder boxes. I absolutely agree with Dmitry - transient processes in electric circuits take milliseconds and nothing should burn. But a bad contact or zero burnout in a three-phase four-wire network leads precisely to these results - Tell me please. Here my father has a private house that is powered by overhead lines. But in the basement there is just a small closet (where the counter, ouzo and automatic machines) turns out this is not an ASU? After all, there are no overvoltage limiters there. And it turns out there in the REN cabinet the conductor was divided into PE and H, because at home all the euro sockets. Is it correct? and whether the PE should be re-grounded and in what way please tell me, are there any standard distances not only from communications, but maybe from walls or passages? It’s unrealistic to find an understanding electrician. Some are French, that is, juliennes. A good landmark is cozy only in prices. Demand creates supply And what can I ask an “electrician” who doesn’t know how to ensure selectivity along the curve -B, C, D. The abbreviation Uzip or ops and how they differ leads electricians to a state of shock. I have nowhere to get clear, specific diagrams and explanations, what I can order in those organizations where you send us. As a result, at a time, without any thunderstorm, household appliances and silence burn in all the apartments of the multi-kv house. A house, an apartment, a private house. Before this, the light turns on, the socket works, money for the barrel. Hello. On the building (1.5 sq.m) power consumption is 40 kW. A corrugation or a metal hose is required for additional mechanical protection of the cable. If you think it's necessary, then use it. Personally, I would do it along the street in corrugation, and inside the building on trays without it. The cable is correct. Directly in front of the counter, set the machine to 63 (A) - this is. Thanks Dmitry, everything is very informative, but I would like to know how meters should be connected in the ASU in an apartment building with two entrances? We have a big one. As our electrician says, we have three meters, one for the elevator, one for the right wing of two entrances and the other for the left wing of two entrances. The left wing is three one-room apartments and entrance lighting, and the right wing is two one- and two-room apartments and corridor lighting. I have a question for you, can I connect in this way or should one meter be for apartments and the other for lighting corridors, padval and attic. Please tell me what to refer to so that everything is correctly done. Thank you very much in advance. Alexei. Alexey, everything is being done according to the project, which is approved by the energy supply organization. But I will say that there are no special requirements here, it all depends on the ASU schemes and loads. In residential buildings, most often we installed one PU for the entire house. Sometimes it was necessary to install a separate launcher on the elevators, but this is again according to the project. Hello Dmitry! The article is gorgeous, thank you! Please help: in an apartment building, in the basement there is an ASU, residents demand access there, as they are often “knocked out”. Access to the ASU premises, as well as to other electrical premises, is allowed to persons who have at least 2 electrical safety groups, accompanied by a person with group 3. Well, with group 3 alone. strangers in the shield room. Hello Dmitry, advise what to do. Question Why starter? What does it turn on and off. In the photo where the old lie is, where on the left there is a knife switch in the closet, and on the right there are cork fuses. Thank you. Albert, this starter is needed to automatically turn on outdoor lighting. A photorelay is installed on the facade of the house, which controls the coil of this starter. Here is a similar one. Thank you! I thought it was some kind of ventilation or smoke removal. I saw a similar lie in a Stalinist house in one entrance. Hello! I don’t understand, why do old-style ASUs use current transformers? Did you say for electricity metering? How does this happen? And you can throw out the schematic of the new ASU? Thank you. Hello! Help to understand the situation. I have no light in the entrance to the ASU room, as well as the front door to this room. I turned to the management company to at least make the light. There is a switch on the wall and wires sticking out in place of the lamp. But he received a sharply negative reaction from local electricians and their power engineers. They say that the light is not needed there, they say you will climb in the cabinets. If they work there, they will connect in the distribution cabinets themselves or use flashlights. And they say the tenants have nothing to poke their nose into these matters. Moreover, the power engineer began to say that according to the design of the house, there is no light, although there are wires and a switch. In this room without light, there is only rubbish, homeless people have arranged a couch, small children play hide and seek. Well, at least he made them close the cabinets with a key, otherwise they were open. After all, children could easily climb up there. He brought them paragraph 7.1.30 of the EIC that there should be light in the room. But they don't care. Please tell me how to oblige the power engineer and his electricians to make lighting. Where can I complain in such cases (to the energy supervision)? Oleg, you never know what they say. In the PUE, clause 7.1.28 it is clearly stated that the ASU and MSB should be installed in switchboard rooms accessible only to service personnel. In the PUE, clause 7.1.29. also mentions the doors of electrical rooms, which should open outwards. A In PUE, clause 7.1.30. it is said that the premises in which ASU and MSB are installed must have natural ventilation and electric lighting. Thus, the doors of the ASU must be locked from unauthorized persons, including residents, and have lighting. Please contact the energy department and explain the situation to them. Hello. I am new to design and have a question. What switching devices are recommended to be installed on the outgoing lines in the ASU? As you can see, PE aluminum bus is used. According to PUE 1.7.119, the PE bus must be copper or, in extreme cases, steel Dmitry, good day! In my and neighboring apartment buildings (16-18 apartments) built in the 70-90s, the ASU consists of a single switch with 100 amp ceramic fuses. Additionally, a couple of years ago, a RES was installed on the facade of the house with a direct connection control panel with 80 ampere automatic machines before and after the control panel (all this is on the line before the knife switch). The question is: taking into account the increased energy consumption in recent years, are these current parameters not enough? What maximum rating machine can I install on the line running from the driveway to the apartment, when reconstructing the electrical wiring in the apartment located in the above houses? Admin, but do not tell me such a moment. The organization that formally serves everything at the school refuses to cooperate, so we will work ourselves. It is necessary to install a new socket for PN at 16A, and for this, de-energize the bus. Question: in order to turn off the RC-x switch, it turns out that you must first turn off all the floor boards powered by these tires? Or reduce the current / wait until the current drops to some value (5-10 amperes per phase, or how much) and with a sharp movement of the handle to the center? General Drozd, switch switch switch strife. Those that are equipped with arc chutes, they can theoretically cut off the rated load currents. Which cameras do not have, then only a very small current or no load at all. In practice, it is better not to take risks and do not turn off the load with knife switches. In your case, can't the load be removed in the floor boards by turning off the input or all outgoing machines in them ?! In my case, colleague, there are no cameras there, the knife switches are not even covered by the front panel. There is not even a diagram of which floor boards are fed from here, from this section of the ASU. Therefore, it’s just that you have to extinguish half of the building by enumeration, one with a walkie-talkie on the floors, turns off the shields, the second looks at the currents in the phases of the section. General Drozd, as an option, if possible (for example, in the evening after training classes), then order the machine to be turned off at the TP from which your ASU is powered. Get the job done quickly. Small currents, of course, can be turned off, only carefully, it is better to wear gloves and a protective screen - this is just in case. Well, or act as you described. About the kettle - that's just the same and sparks, and over time, such sockets are replaced. Helmet + Wolverine screen and latex gloves are mandatory, I always carry them with me and all the inclusions of unfamiliar devices are so. If the electrical circuit breaks under load, there will definitely be an arc or sparking, but you will not do this all the time (as in the example with turning off the kettle). I am sure at 10-15 A there will be a dangerous destruction of the power electrical contacts of the knife switch, and even more so there will be no overlap between the phases. Alexei: They worked (another 8.04) at 12 amps on a larger phase. When turned off, it's very quiet, no sparks or crackling. Everything just went out. But these 12 amperes ... extinguished everything that they found. So still GDE_TO consumers sat. And this is a post-1992 entry school, not a devil-shed. Looked completely a subject of this section and comments to it. As always done at a good technical level, in detail, arousing great interest among the audience of the site. Of course there are a few additions and comments (as without them). I would suggest making number marking of groups in the ASU. It is clear that the group numbers should be from left to right, but without this marking it is impossible to work. Good afternoon. Is it necessary to change the cabinet in the ASU to a modern one with IP 31 or is there still no such mandatory norm? Sincerely. Thanks for the site - it really helps a lot. Dmitry, it is not necessary to change the ASU cabinet if it is in a satisfactory condition (not rusty), it has a lockable door, etc. During major overhauls, the ASU was changed only after an examination of its condition or when it was impossible to install new equipment in it. Why make a separate memory circuit in the ASU room ?! This requirement is unfounded and redundant. If you have completed the separation of the PEN conductor, then you will have the main PE bus (GZSH) installed in the cabinet itself, and ground all metal structures on it if necessary. Hello! Is it possible to invite employees of your Electrotechnical Laboratory as experts to assess the state of the ASU in the MKD - Stalinka? Thank you. Good afternoon Hello! Hello Tariel. 1. Yes, it will be energized, because. shield is not grounded, but zeroed. Read more about this in the article about. 2. The question is rather rhetorical, because according to the PUE, clause 7.1.3, the input device (VU) is a set of structures, devices and devices installed at the input of the supply line to the building or to its separate part. In fact, both shields belong to the ASU, they are simply separated from each other. Good afternoon. Tell me please, for what purposes was the contactor used in the old ASU? Not for automatic lighting or what? I also met a board near the contactor with a trance, relays and other strapping (resistors, electrolytes). Of course, this has not been working for a long time. And I met a small box near the ASU box, also with a contactor, a scarf, light bulbs and toggle switches, and it was connected by cable to the ASU with more than 5 wires. But the cable was cut off and I could not understand which circuits the contactor closed. And yet, is it possible to replace fuse-links (100 A) with automatic machines? As I understand it, 100 A selective machines are used for these purposes? Dmitry, remote control is possible, for example, street lighting or other automation. A step-down transformer should be installed there to power the basement lighting. Now it's hard to say... You can replace fuses with automatic devices, but you need to make a calculation, taking into account the load, the selectivity of other protection devices, the cross-sections of the cores of outgoing lines, etc. In any case, there is no way to do without a project. Good afternoon I would not only change the fuses. Although it may not give anything. If one phase is heated (one of the fuses), this indicates that one of the phases is most likely heavily loaded. So it is necessary to "unload" it. It is necessary to measure the currents throughout the house. Your emergency workers are strange, so raise the denomination. The cause of overheating must be looked at, perhaps the point is not in the PNs themselves, but in the holders for them. Judging by what you described, you need to check all connections around overheating Agree with General Drozd, all signs of a bad connection, but in any case, tell the electricians to check the currents in the phases, as Albert suggests. Thank you. Can an ordinary electrician from a management company cope with phase measurements? Or is it the competence of the electrical laboratory? Documentation for the house is no longer found. There is a suspicion that the contacts were oxidized just at the holder, and for some reason it is from this fuse that a wire of a smaller cross section comes from than others. He was raised (visible tape), and he is without a tip. But the stripped end of the wire goes to the bolt to the holder, but somewhere in the holder it sparks. And another question arises. Does it make sense to replace the ASP at all without changing the rest of the wiring at home? Capital repairs are planned only in 2024. Do you need a project for a replacement? And from whom to order it? It's strange, but what, there is nothing to measure and compare the currents in phases, even if it's not accurate, then it's impossible to compare? Is it difficult to go broke on the cheapest ticks? Rather, there is already an avalanche-like process - the first overheating due to bad contacts can lead to a deterioration in the connection, and no matter what you put later, at least at 150A., and no one probably touched the contact. “Can an ordinary electrician from a management company cope with phase measurements? Or is it the competence of the electrical laboratory? I somehow cope, and there are also crusts on measurements and tests. It is necessary to change the fuse holder, and colleagues to the emergency workers are reprimanded, because they complicate their work (when the wire burns out, there will be much more fuss). In my memory, the PN fuse holder stopped conducting current at all, so the examinations were carried out on it (unofficially), they sorted it out on their own . We found out that the assembly contact, where the outgoing tip is attached, was burned inside. I apologize in advance for the question. Unfortunately, we did not receive a response from our power engineers. So, the house is two-story, the ASU is installed in the entrance under the stairs. There is a lot of space there, and residents store bicycles, sleds, etc. there. It does not look very aesthetically pleasing. So I wanted to hang curtains, behind which everything will be hidden from view, including the ASU. But, I was warned that there could be problems with power engineers, threatening a fine for violating safety rules. Is this really so, and what documents regulate it? The ASU itself is not additionally fenced. Thank you. Problems with power engineers can arise if the curtains in any way interfere with the maintenance of the ASU - complicate access, prevent the door from closing, get in the way. In general, first of all, you need to ask a question to residents who turn a potentially dangerous object into a pantry. Bicycles, sleds, what's next? Rags? fuel? I now thought that all the same against curtains. You will get a separate fenced room in which the tenants will start throwing all sorts of rubbish. It's not the point. Problems will arise not only from curtains, but also from bicycles, etc., if something happens in the ASU or after it and you have to quickly get to it, and at that time sleds, buckets, basins fall on your head ... So I'm trying to explain to people that shields and other things are not crap that needs to be removed to the far upper corner, but a workplace in an emergency. And then fill up access, lock it up with a refrigerator, a closet. Vladimir. Regarding the discussion of this issue. Zinaida, there are no prohibitions in the PUE about curtains, you can, as it were, visually separate the ASU from the stairs, it will be even better. On the curtains, I would hang a sign "Caution! Voltage". But it is advisable to remove sleds, bicycles, etc. from there, because. they can restrict access to the shield and in the event of an emergency, they can become a serious hindrance. In general, according to the mind, instead of curtains, it would be better to fence off this square, for example, with a metal grill and install a door with a lock. Here are a few quotes from the PUE about the ASU: clause 7.1.28. VU, VRU, MSB, as a rule, should be installed in switchboard rooms accessible only to service personnel. In areas prone to flooding, they should be installed above the flood level. VU, ASU, MSB can be located in premises allocated in operated dry basements, provided that these premises are accessible to service personnel and are separated from other premises by partitions with a fire resistance limit of at least 0.75 hours. distribution points and group boards outside the switchboard rooms, they should be installed in places convenient and accessible for maintenance, in cabinets with a shell protection degree of at least IP31. Thanks a lot!!! I will use your advice. Hello, help me collect a lie, power comes 95 aluminum, the power of all consumers is 170 kW Alexander, how do you imagine it? Here's what I can do. But where am I, where are you, who will take over your VRU, respectively, what requirements for the project, if any? Or do you think that we can help you with words here, and you yourself? So it's not just one line. Hi Everyone. I have a question about how the lighting of the shield itself should be powered. Before the counter or after? and on the basis of what regulatory documents it is connected to the knife switch .. Inspectors came from Energia OJSC and write me a fine for connecting the lighting lamp in the shield itself, I lie to the meter ... really looking forward to the answer I read it with interest. I have a question. In a couple of years, a major overhaul of the power supply is planned in my pre-revolutionary apartment building. Do I understand correctly that the wiring must be replaced, including from the floor panel to the meter located in the apartment (there is only one machine per apartment installed on the floor panel)? Will a PE entry be made up to the apartment panel? Thank you for the detailed answer. Apparently, the amount of overhaul will depend on the amount of funding. An introductory machine for an apartment 16 A with modern household appliances is nothing. So far there haven't been any real problems. Hello! I purchased a non-residential premises of 17 sq. m in an apartment building in which an ASU is installed. Can I, as the owner, demand that it be moved? Anton, the ASU does not apply to your property and any of its movements must be coordinated with the management company or networks serving your home. Even if you are given permission to move it (although it is unlikely), then you still cannot do without a project. Hello) do not prompt? Is it possible to connect 2 consumers to one group of inserts in a switch cabinet (assembly) 0.4kV. And vice versa, connect one consumer to 2 groups of inserts (since, for example, the tweezers in the first group in phase “C”, for example, broke, and was hastily connected to another group), is this allowed by the rules or not?)) all consumers are 3-phase , if you tell me the point in the PUE where this is written, I would be very grateful) Hello, please tell me what kind of knife switch is installed in the photo under the following description "In this VRU-0.4 (kV), the power lines are protected by similar glass fuses, and the lighting circuits are protected by ceramic cork fuses (plugs) of the PRS type." Konstantin, this is also an ordinary knife switch with fuses with a side drive (for example, RPS-4 type), the handle of which is located on the surface of the panel or shield case. Find analogues without problems, they have the same designation. There are options for circuit breakers with fuses, but only placed in separate boxes. Their designations are YABPVU. Hello. My private house will be connected to the network, I need to make an ASU, which I plan to hang outside the house. Inside there will be an SPD, a meter, a division of PEN into PE and N. Rosseti gives me 15 kW. 0.4 kV. I decide which introductory machine to put in, so that in the future, if a short circuit happens in the house, I would not turn off the introductory in the ASU and do not have to run outside to turn it on. Alexey, it all depends on the magnitude of the short-circuit currents, under certain conditions both can work. I wouldn't do that in your case. At the input in the house, I would not install C25, but a HV load switch. So selectivity will be observed between the introductory and outgoing machines, and the switching device will remain, with which you can turn off the whole house at once. Dmitry, VN is convenient, but it turns out that the meter and the line after it remain without short circuit protection. Alex, you are wrong! The introductory machine protects the line from its lower contacts and to the nearest outgoing machine in the house. I mean, if in this scheme we replace the introductory machine with a VN. Aleksey, you first asked about two automatic machines, one in the ASU on the street, and the other in the house. I told you that it is not necessary to install an automatic machine in the house, and if you really want to, then instead of the automatic machine, you can install a load switch. Please note that I did not give you recommendations to replace the machine on the street, and the sales company will not go for it, because. the allocated power is just the same and is determined by the nominal value of this machine. Good day! I want to apologize in advance for the stupid question. But it worries me, I can’t do anything. Tell me, please. In the new building, the ASU is installed on the first floor, there is a separate entrance from the street. Installed on our riser, our apartment is on the third floor. Is there any harm from such a neighborhood? The kitchen is located in this area. And on the second is also an ordinary apartment. Is this allowed by the rules? Yana, the norms allow and harm such a neighborhood in itself does not carry! What is the harm and why? Thank you very much for your answer! Good afternoon, Dmitry. Hello. Here is a question. There is a building-kindergarten, in it the ASU, which is sometimes heated. Many fasteners in it and in the main switchboard are rusted and in poor condition. On the basis of what regulatory documents can they issue an order to bring the ASU into the proper form? Michael, this is a broad question. Surely, in addition to rust, there is a lot to pay attention to. On your question, here is an excerpt from one court ruling on a similar problem: there are traces of flooding of the premises, the pipeline is covered with rust, there are traces of corrosion of metal parts of electrical panels and electrical equipment (PUE p. 7.1.28, 1.1.20 PTEEP p. 1.7.2). Hello! In the photo I'm lying, taking into account, the fuse holders are installed on a solid sheet .. is this permissible? Is it not necessary to put them on special rails? Hello dear. Good afternoon. I would like to ask a question, in the work a small lie for the object. |
New
- Kievan Rus: education and history
- What vitamins are good for facial skin?
- Rudbeckia is spinous. Rudbeckia is a perennial. flower planting technology
- Secrets of losing weight by Ksenia Borodina What pills did Ksenia Borodina take for weight loss
- Kuriles: history with geography History of the disputed Kuril Islands
- Beer styles: porter and stout, lager and ale
- The optimal temperature for each stage of the distillation of moonshine and mash
- Rye malt and what can be done with it?
- How to make fortified wine at home
- How to make wine yeast at home, instructions for use